Project Overview
A 7 day garage conversion project completed for a customer who was expanding their soap manufacturing business. The client required space for storage as well, so we separated the garage, by building a partition wall.
A brand new dedicated consumer unit for the garage was installed, and a purpose designed work area was fitted.
- To begin, we removed all the old fixtures and fittings and upgraded the consumer unit in the garage.
- We laid floor insualtion along with a new chipboard floor.
- We then proceeded to layout the room and erect the partition wall and stud the room out ready for the wall insulation and then plasterboard.
- We drew our attention to fitting to loft hatches, for each of the wo rooms, followed by a first fix on the electrics.
- We proceeded to plasterboard the walls and ceiling, finished off a new laminate flooring, laid throughout.
- Our attention was then on the work area, including the bespoke kitchen design, that was installed.
- Finally the two rooms were plastered and then painted.